Aircon installation
- Indoor unit make, model and serial no.
- Outdoor unit make, model and serial no.
- Refrigerant type (R32 / R410A / other)
- Site survey agreed with client: indoor and outdoor positions, pipe route, drain route
- Wall brackets / outdoor stand secured, unit level, anti-vibration pads fitted
- Clearances to manufacturer spec (indoor top/sides, outdoor airflow)
- Pipework flared/brazed correctly, nitrogen used when brazing
- Pipes and cable insulated and secured, trunking fitted and sealed
- Wall penetration sealed and weatherproofed
- Pressure test with nitrogen, no drop over test period
- Test pressure (kPa) and duration
- Vacuum to below 500 microns, decay test held
- Final vacuum (microns)
- Refrigerant released / topped up for pipe length
- Refrigerant added (kg)
- Drain fall correct and water test done, no leaks
- Dedicated circuit, correct breaker size, isolator within reach of outdoor unit
- Electrical connections tight, earth connected
- Unit run in cool and heat for at least 15 minutes
- Supply air temperature (°C)
- Return air temperature (°C)
- Running current (A)
- Remote paired, time set, client shown how to use it and clean filters
- Site cleaned, packaging removed
- Warranty registration details recorded
Aircon service
- Unit make, model and serial no.
- Filters removed, washed and refitted
- Indoor coil cleaned (coil cleaner / sanitiser)
- Blower wheel and fan cleaned
- Drain tray and drain line flushed, pump tested if fitted
- Outdoor coil cleaned, debris cleared around unit
- Fan blades and motor checked
- Electrical connections checked and tightened
- Capacitor checked
- Suction pressure
- Running current (A)
- Supply air temperature (°C)
- Return air temperature (°C)
- Remote and display working, no error codes
- Faults found / recommendations
Aircon repair / fault
- Fault reported by client
- Error code(s) shown
- Power supply, breaker and isolator checked
- Fault found
- Parts replaced (with part numbers)
- Leak test done if refrigerant was low
- Refrigerant added (kg), if any
- Unit tested and running normally
- Quote needed for further work
VRV / VRF service
- System / outdoor unit model and serial no.
- Number of indoor units serviced
- Error history read from system
- Outdoor unit coils cleaned, fans checked
- Indoor unit filters cleaned, drains checked
- Communication wiring and addressing checked
- High and low pressures
- Outdoor ambient temperature (°C)
- Central controller / BMS interface checked
- Oil and refrigerant levels within spec
- Recommendations
Extraction & ventilation
- Fan type, model and location
- Fan running, correct direction, no vibration
- Belts / bearings checked (if fitted)
- Filters and grilles cleaned
- Ducting and flexible connections checked for leaks
- Controls / timers / sensors working
- Airflow reading (if measured)