Solar & backup power
Job cards for solar & backup power companies.
PV and hybrid installs, inverter and battery services, UPS and generators — serial numbers and readings included. Techs fill them in on their phones — even with no signal.
Start free trialReady-made checklists
☐ = tick box ✎ = the tech types a reading, serial number or certificate number. Every job also records arrival time, before/after photos, materials and the client's signature.
Solar / hybrid installation
- Inverter make, model and serial no.
- Battery make, model, capacity (kWh) and serial no(s).
- Panels — make, watts each, quantity, strings
- Roof inspected; mounting rails fixed to rafters, roof sealed at every penetration
- Panels earthed, frames bonded
- DC isolator and DC surge protection fitted
- AC isolator, AC surge protection and changeover / bypass fitted
- Battery fused / breaker protected, cables sized correctly
- String open-circuit voltage (V) per string
- String short-circuit current (A) per string
- Polarity checked before connecting inverter
- Inverter settings: grid mode, battery type, charge limits, export limit
- Inverter NRS 097-2-1 certificate available (needed for municipal registration)
- Monitoring app set up and linked to client's account
- Tested on grid, on battery (grid off) and generator input (if any)
- Labels and warning signs fitted at DB, inverter and isolators
- Client shown how to use the app and isolate the system
- COC number (electrical) and SSEG application status
Solar / inverter service
- Inverter and battery serial nos.
- Error / fault history from inverter
- Panels inspected and cleaned (if agreed)
- Mounting and roof penetrations checked
- DC and AC connections checked and torqued
- Inverter fans and vents cleaned
- Battery state of health (%)
- Firmware up to date
- Daily generation vs expected
- Recommendations
UPS service
- UPS make, model, kVA and serial no.
- Battery type, quantity and install date
- Load assessed against UPS rating
- Load (%)
- Battery test / runtime test done
- Runtime at current load (min)
- Bypass and changeover tested
- Alarms and display working, no faults
- Fans and vents cleaned
Generator service
- Generator make, model, kVA and serial no.
- Running hours
- Oil level and condition checked / changed
- Oil, fuel and air filters checked / replaced
- Coolant level checked (if water cooled)
- Battery and charger checked
- Battery voltage (V)
- Belts and hoses checked
- Fuel level and fuel condition checked
- Changeover (ATS) tested with mains off
- Run under load
- Output voltage and frequency (V / Hz)
- No leaks or unusual noise
- Next service due (hours or date)
Use these checklists from today.
Change any line, add your own, or build new job types.
Start free trial