Electrical
Job cards for electrical companies.
COC inspections, installations, fault-finding and DB upgrades, with the SANS 10142-1 test readings recorded. Techs fill them in on their phones — even with no signal.
Start free trialReady-made checklists
☐ = tick box ✎ = the tech types a reading, serial number or certificate number. Every job also records arrival time, before/after photos, materials and the client's signature.
COC inspection & test
- Property address and erf / stand no.
- Supply type (single / three phase) and main switch rating (A)
- Number of distribution boards
- Main switch and DBs: correct, accessible, covers and blanks in place
- Circuits, breakers, earth leakage units and DBs correctly and permanently labelled
- Earth leakage unit installed and tested
- Earth leakage rated trip current (mA)
- Earth leakage trip time (ms)
- Surge protection installed (yes / no)
- Main earth and bonding of metal pipes and structures in place
- Continuity of bonding compliant
- Earth continuity at all points of consumption compliant
- Earth loop impedance at main switch (Ω)
- Neutral loop impedance at main switch (Ω)
- Prospective short circuit current (kA)
- Insulation resistance (MΩ)
- Voltage between neutral and earth (V)
- Phase voltages (V)
- Polarity correct at all points checked
- Sockets, switches, isolators and light fittings checked
- Geyser on own circuit with isolator
- Alternative supply (solar, generator, UPS) installed and correctly isolated (if any)
- Defects found and remedial work needed
- COC number and date issued
- Registered person's name and registration no.
Electrical installation
- Description of work
- Isolated and locked out before work, tested dead
- Cable sizes correct for load and run length
- Circuits added or changed
- Circuits labelled at DB
- Earth continuity tested on new circuits
- Insulation resistance tested on new circuits
- Earth leakage tested after work
- Covers, blanks and trunking lids fitted
- Client told whether a new COC is needed
Electrical fault-finding
- Fault reported
- Safe isolation done before testing
- Circuits / DB tested
- Cause found
- Repair done and parts used
- Circuit tested and working, earth leakage not tripping
- DB left closed and safe
- Quote needed for further work
DB upgrade
- Old DB description, new DB make and size
- Supply authority / landlord notified if needed
- All circuits identified and labelled before disconnecting
- Main switch, earth leakage and surge protection fitted
- Breaker ratings matched to cable sizes
- Earth bar and neutral bar connections tight
- Insulation resistance (MΩ)
- Earth leakage trip time (ms)
- New DB labelled; old DB removed from site
- COC issued for the work
Lighting
- Number and type of fittings
- Circuit isolated before work
- Fittings secure, earth connected where required
- Switching and dimming tested
- Emergency lights tested (if any)
- Old fittings and globes removed or disposed of
Use these checklists from today.
Change any line, add your own, or build new job types.
Start free trial