Electrical

Job cards for electrical companies.

COC inspections, installations, fault-finding and DB upgrades, with the SANS 10142-1 test readings recorded. Techs fill them in on their phones — even with no signal.

Start free trial

Ready-made checklists

☐ = tick box   ✎ = the tech types a reading, serial number or certificate number. Every job also records arrival time, before/after photos, materials and the client's signature.

COC inspection & test

  • Property address and erf / stand no.
  • Supply type (single / three phase) and main switch rating (A)
  • Number of distribution boards
  • Main switch and DBs: correct, accessible, covers and blanks in place
  • Circuits, breakers, earth leakage units and DBs correctly and permanently labelled
  • Earth leakage unit installed and tested
  • Earth leakage rated trip current (mA)
  • Earth leakage trip time (ms)
  • Surge protection installed (yes / no)
  • Main earth and bonding of metal pipes and structures in place
  • Continuity of bonding compliant
  • Earth continuity at all points of consumption compliant
  • Earth loop impedance at main switch (Ω)
  • Neutral loop impedance at main switch (Ω)
  • Prospective short circuit current (kA)
  • Insulation resistance (MΩ)
  • Voltage between neutral and earth (V)
  • Phase voltages (V)
  • Polarity correct at all points checked
  • Sockets, switches, isolators and light fittings checked
  • Geyser on own circuit with isolator
  • Alternative supply (solar, generator, UPS) installed and correctly isolated (if any)
  • Defects found and remedial work needed
  • COC number and date issued
  • Registered person's name and registration no.

Electrical installation

  • Description of work
  • Isolated and locked out before work, tested dead
  • Cable sizes correct for load and run length
  • Circuits added or changed
  • Circuits labelled at DB
  • Earth continuity tested on new circuits
  • Insulation resistance tested on new circuits
  • Earth leakage tested after work
  • Covers, blanks and trunking lids fitted
  • Client told whether a new COC is needed

Electrical fault-finding

  • Fault reported
  • Safe isolation done before testing
  • Circuits / DB tested
  • Cause found
  • Repair done and parts used
  • Circuit tested and working, earth leakage not tripping
  • DB left closed and safe
  • Quote needed for further work

DB upgrade

  • Old DB description, new DB make and size
  • Supply authority / landlord notified if needed
  • All circuits identified and labelled before disconnecting
  • Main switch, earth leakage and surge protection fitted
  • Breaker ratings matched to cable sizes
  • Earth bar and neutral bar connections tight
  • Insulation resistance (MΩ)
  • Earth leakage trip time (ms)
  • New DB labelled; old DB removed from site
  • COC issued for the work

Lighting

  • Number and type of fittings
  • Circuit isolated before work
  • Fittings secure, earth connected where required
  • Switching and dimming tested
  • Emergency lights tested (if any)
  • Old fittings and globes removed or disposed of