Plumbing
Job cards for plumbing companies.
Geyser installs to SANS 10254, leaks, drains and fittings — with PIRB COC numbers on the job card. Techs fill them in on their phones — even with no signal.
Start free trialReady-made checklists
☐ = tick box ✎ = the tech types a reading, serial number or certificate number. Every job also records arrival time, before/after photos, materials and the client's signature.
Geyser installation
- New geyser make, size (litres), pressure rating and serial no.
- Old geyser details (if replaced)
- Water and power isolated before work
- Geyser supported properly (roof trusses / brackets)
- Drip tray fitted under geyser
- Drip tray drain pipe runs to outside the building
- Pressure control valve fitted
- Pressure rating (kPa)
- Temperature and pressure (T&P) valve fitted, discharge pipe routed safely outside
- Vacuum breakers fitted on hot and cold lines
- Drain cock fitted
- Isolator switch near the geyser
- Geyser on its own circuit and breaker
- Thermostat set
- Thermostat setting (°C)
- Filled, bled and checked for leaks before power on
- Heating confirmed
- Old geyser removed from site
- Plumbing COC number (PIRB)
- Electrical COC for geyser circuit issued if required
- Insurance claim details recorded (if insurance job)
- Insurance claim no.
Leak detection & repair
- Leak reported and location
- Water meter test done (all taps off)
- Meter reading start and end
- Leak found and cause
- Repair done and parts used
- Pressure tested after repair, no leaks
- Damage photographed for insurance (if needed)
Blocked drains
- Drain / fixture blocked
- Method used (plunger, rods, machine, jetting)
- Cause found (roots, fat, foreign object, collapse)
- Drain flowing freely after clearing
- Camera inspection done (if needed)
- Area cleaned and disinfected
- Quote needed for further work
Taps, toilets & fittings
- Fittings repaired or replaced
- Water isolated before work
- Washers / cartridges / valves replaced as needed
- Toilet cistern filling and flushing correctly
- No leaks after work
Heat pump / solar geyser
- Unit make, model and serial no.
- Unit mounted and level, clearances to spec
- Plumbing connections done with safety valves
- Electrical circuit and isolator done
- Controller / timer set
- Water temperature after test run (°C)
- Client shown how to use controller
Use these checklists from today.
Change any line, add your own, or build new job types.
Start free trial