Security

Job cards for security companies.

CCTV, alarms, access control and electric fencing, from walk tests to compliance certificate numbers. Techs fill them in on their phones — even with no signal.

Start free trial

Ready-made checklists

☐ = tick box   ✎ = the tech types a reading, serial number or certificate number. Every job also records arrival time, before/after photos, materials and the client's signature.

CCTV installation

  • NVR/DVR make, model and serial no.
  • Number of cameras, make and model
  • Camera positions agreed with client and marked on a sketch
  • Cameras mounted securely, weatherproof junction boxes outside
  • Cabling in conduit / trunking, connectors weatherproofed
  • PoE switch or power supplies sized correctly
  • Every camera showing a clear picture day and night (IR checked)
  • Recording schedule and motion detection set
  • Hard drive size and days of recording
  • Date and time set, time sync on
  • Remote viewing app set up on client's phone
  • Default passwords changed; admin password given to client only
  • Firmware updated
  • Client shown how to play back and export footage
  • POPIA signage (“CCTV in operation”) recommended / fitted

CCTV service

  • NVR/DVR serial no.
  • All cameras online and recording
  • Lenses / domes cleaned
  • Cameras with faults
  • Hard drive health checked
  • Days of recording available
  • Time and date correct
  • Firmware updated
  • Remote viewing tested

Alarm system

  • Panel make, model and serial no.
  • Number of zones and keypads
  • Every detector / beam walk-tested and showing on panel
  • Panic buttons tested
  • Siren and strobe tested
  • Backup battery tested
  • Battery voltage (V)
  • Tamper switches working
  • Signal to armed-response / monitoring company confirmed
  • Monitoring company and account no.
  • App / remote arming tested
  • User codes set; client shown how to arm and disarm

Access control & intercoms

  • Controller make, model and serial no.
  • Readers / keypads / biometric units mounted and working
  • Locks and maglocks release and re-lock correctly
  • Fail-safe / fail-secure set as agreed (fire escape doors fail-safe)
  • Exit buttons and break-glass units working
  • Users and tags / cards loaded
  • Number of users loaded
  • Intercom audio and video tested at each station
  • Backup power tested

Electric fencing

  • Energiser make, model and serial no.
  • Fence length and number of strands
  • Energiser earth spikes installed and tested
  • Fence voltage at far end (kV)
  • Warning signs fitted at required spacing
  • Insulators, strain and tension checked
  • Vegetation cleared from fence line
  • Alarm output to panel / monitoring tested
  • Electric fence certificate of compliance issued (new install or transfer)
  • Fence certificate no.

Use these checklists from today.

Change any line, add your own, or build new job types.

Start free trial