Refrigeration

Job cards for refrigeration companies.

Cold rooms, display fridges and freezers, with temperatures before and after. Techs fill them in on their phones — even with no signal.

Start free trial

Ready-made checklists

☐ = tick box   ✎ = the tech types a reading, serial number or certificate number. Every job also records arrival time, before/after photos, materials and the client's signature.

Commercial refrigeration

  • Unit type, make, model and serial no.
  • Refrigerant type
  • Cabinet / room temperature on arrival (°C)
  • Condenser coil cleaned
  • Evaporator coil and fans checked, ice build-up cleared
  • Defrost cycle and drain checked
  • Door seals and hinges checked; door closes properly
  • Suction and discharge pressures
  • Running current (A)
  • Thermostat / controller set correctly
  • Temperature after work (°C)
  • Leak check done
  • Refrigerant added (kg), if any
  • Alarms (high temperature) tested

Use these checklists from today.

Change any line, add your own, or build new job types.

Start free trial