Refrigeration
Job cards for refrigeration companies.
Cold rooms, display fridges and freezers, with temperatures before and after. Techs fill them in on their phones — even with no signal.
Start free trialReady-made checklists
☐ = tick box ✎ = the tech types a reading, serial number or certificate number. Every job also records arrival time, before/after photos, materials and the client's signature.
Commercial refrigeration
- Unit type, make, model and serial no.
- Refrigerant type
- Cabinet / room temperature on arrival (°C)
- Condenser coil cleaned
- Evaporator coil and fans checked, ice build-up cleared
- Defrost cycle and drain checked
- Door seals and hinges checked; door closes properly
- Suction and discharge pressures
- Running current (A)
- Thermostat / controller set correctly
- Temperature after work (°C)
- Leak check done
- Refrigerant added (kg), if any
- Alarms (high temperature) tested
Use these checklists from today.
Change any line, add your own, or build new job types.
Start free trial